Water Register
  • Intelligence
  • Tools
  • Transfers
  • Guides
  • Pricing
  • Open Dashboard

Transfer cases

The Town of Okotoks, Bow River Sub-basin

ERV verified 2026-06-27 · TRF-2015-025 · LOWER BOW RIVER · permanent

Permanent allocation transfer to The Town of Okotoks (Bow River Sub-basin). Priority 2005 carried to authorization DAUT0018126 approved 2015-11-05.

SellerUnknown (prior licensee, ERV verification pending)
BuyerThe Town of Okotoks
EPA authorizationDAUT0018126
Volume4,101 m³/yr
Priority2005-10-02-0001
Closed date2015-11-05
Price (reported)Not disclosed
Holdbacknone

Sources

  • Long-awaited pipeline bringing water to Okotoks (FORP valve turning)
  • Okotoks regional water project celebrates milestone with valve-turning ceremony
  • Foothills Okotoks Regional Water Project — Pipeline (interim Bow delivery)
  • ERV authorization DAUT0018126
  • Province approves water licence transfer (Okotoks acquisitions)
  • A river runs through it, Okotoks water strategy and licence transfers

Water Register restates publicly available information in a reference format. It is not legal, engineering, or regulatory advice. Transfer approval remains at the discretion of Alberta Environment and Protected Areas or the Alberta Energy Regulator. Verify all licence details against the Environmental Records Viewer before transaction decisions.

Open sold archive